Search

Your search for "" found 1944 Hits

Issue 06/2014 Austria

ÖBV Construction Congress 2014

The Austrian Society for Construction Technology (ÖBV) stages a construction congress every two years for clients, the construction and building materials industry as well as for engineering offices. 1800 participants from twelve countries attended the event in Vienna in April. Numerous papers among the 50 lectures dealing with research and development, practice and project development, which are available in a 122-page set of Proceedings dealt with infrastructure and underground construction.

more
Issue 06/2014 Short Tail Excavators

With Hammer and Chisel: Excavators at the Albabstieg

The required precut in the terrain as well as the working and storage areas for the Albabstieg Tunnel has long been completed. The first 300 m of the 5.9 km long section, over which the trains between...

more
Issue 06/2014 4th Munich Tunnelling Symposium

Structural Fire Protection and contractual Concepts in Tunnelling

The Support Association for Structural Engineering of the University of the Bundeswehr (UniBW) Munich staged the 4th Munich Tunnelling Symposium at the end of May in collaboration with the Research...

more
Issue 06/2014 Albaufstieg

Steinbühl Railway Tunnel: Safe with Shotcrete

Deutsche Bahn’s newly built route from Wendlingen to Ulm is a mecca for discerning tunnel builders. This is because half of the route passes through tunnels, which cut through a wide range of different rock strata. A variety of construction methods are required: To create the first tunnel, the Steinbühl tunnel, the shotcrete construction method is used. The 4.8 km long Steinbühl tunnel, together with the Boßler tunnel, will help trains with the difficult climb at Albaufstieg. It is entered at Hohenstadt, at an altitude of 746 metres, close to the A8 Autobahn. In eight years’ time, trains will be racing through it at 250 km/h.

more
Issue 06/2014

Mode of Construction for the New Rosshäusern Tunnel changed

The 43 km long, largely single-track line between Berne and NeuchâtelIt is currently being developed with twin tracks by the private Swiss rail company BLS AG. The new 2080 m long, twin-track Rosshäusern Tunnel represents the core of the Rosshäusern-Mauss construction section. A change in the method of driving bringing with it greater industrial safety was decided on resulting from difficult geological circumstances as work progressed and a tragic accident with fatal consequences. As further fault zones had to be reckoned with as work went on it was decided to adopt the crown driving method with pipe umbrella in rock.

more
Issue 06/2014

40th ITA Annual Meeting: Activities of the Working Groups and Committees

In tunnel issue 5/2014 we informed you about the most important aspects of the 40th Annual Meeting of the International Tunnelling and Underground Space Association (ITA) and the 2014 World Tunnel Congress, held from May 9 to 14, 2014 at Foz do Iguaçu, Brazil. In this issue of tunnel you can learn more about the activities of the 13 ITA Working Groups and the four Committees.

more
Issue 06/2014

Rendsburg Canal Tunnel: Safe Drainage in Case of Emergency

Nowadays tunnels represent elements of an economic and ecological infrastructure. To ensure that tunnels are kept in the best possible state and to cope with ever increasing volumes of traffic, refurbishment measures as recently carried out at the Rendsburg Canal Tunnel are essential. Three construction phases involved measures for repairing the concrete on the floor and the walls, fire protection, road construction, and drainage.The refurbishment also includes rescue and evacuation facilities and technical installations.

more
Issue 06/2014 Turkey

Kargi Hydroelectric Project: TBM conquers difficult Ground

Multiple fault zones, variable face conditions and squeezing ground requiring extensive bypass tunneling: These were just a few of the challenges overcome in order to successfully complete Turkey’s...

more
Issue 06/2014 Switzerland

Renovation of the Albula Tunnel approved

The Albula Tunnel opened in 1903 belonging to the Rhaetian Railway (RhB) is 5.8 km long with a single track. A new parallel tunnel is now to be built 30 m away from the existing one owing to damage to...

more
Issue 06/2014 Switzerland

Hot Water from the Tunnel for generating Power

Some 2100 l of water flows out of the tunnel per minute at the north portal of the Vereina Tunnel in the Swiss Canton of Graubünden. The energy potential of this water which has a temperature of 17 °C is now to be exploited for the geothermal generation of power using a heat pump.

more

Ihre Suche nach "" :

5919 Treffer in "AT Minerals"

10788 Treffer in "Bundesbaublatt"

8021 Treffer in "Betonwerk + Fertigteil-Technik"

7305 Treffer in "bauhandwerk"

1198 Treffer in "Brandschutz"

1092 Treffer in "Computer Spezial"

4926 Treffer in "dach+holzbau"

17813 Treffer in "Deutsche BauZeitschrift"

6731 Treffer in "FACILITY MANAGEMENT"

12368 Treffer in "Kälte Klima Aktuell"

6269 Treffer in "metallbau"

1333 Treffer in "recovery"

12636 Treffer in "SHK Profi"

17185 Treffer in "tab - Das Fachmedium der TGA-Branche"

12329 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1944 Treffer in "tunnel"

5737 Treffer in "Zement Kalk Gips"

3532 Treffer in "Ziegelindustrie International"