Search

Your search for "" found 1944 Hits

Germany

Stuttgart 21: Project Partners Celebrate the Start of Tunnel Driving for the Airport Traffic Hub

Deutsche Bahn (German Railways) is taking the next important step in the course of Stuttgart 21 at Stuttgart Airport. On 20 July 2020, the project partners celebrated the start of the main...

more
Austria

Virtual 69th Geomechanics Colloquium/Johann Golser Colloquium

The annual Geomechanics Colloquium in Salzburg has developed as an important meeting point for experts in Central Europe. The event with the associated exhibition usually attracts over 900...

more
Issue 04/2020 Italy | Italien

Santa Lucia Tunnel: Breakthrough for Europe‘s Biggest TBM

In Italy, the largest tunnel boring machine ever used in Europe successfully completed its drive at the Santa Lucia Tunnel on June 8, 2020. The supersize borer (Earth Pressure Balance Shield, diameter...

more
Issue 04/2020

4D/5D BIM: Project Controlling for Excavation Support at the Bertoldshofen Tunnel

During construction of the approx. 600 m long Bertolds-hofen road tunnel in the Allgäu, Bavaria, the mined tunnel including excavation and support measures was represented using the Building...

more
Issue 04/2020

Tunnels to Bad Cannstatt – Undercrossing a Long-Distance Heat Pipeline at Difficult Conditions

During construction of the Stuttgart 21 railway tunnels leading to Bad Cannstatt a shaft and a 2-m-diameter jacking pipe of the long distance heat supply were unexpectedly encountered. At first, the...

more
Issue 04/2020

Issue 04/2020

60 Years For Transport – STUVA Anniversary

The German Research Association for Tunnels and Transportation Facilities (STUVA – Studiengesellschaft für Tunnel und Verkehrsanlagen e. V.) has the same problems as many, celebrating a birthday in...

more
Issue 04/2020

New STUVA Members

The following companies joined the STUVA during the first half of 2020:EJ Deutschland GmbH, Boppard (Germany)Feldhaus Bergbau GmbH & Co. KG, Schmallenberg (Germany)iC Consulten GmbH, Freilassing...

more
Issue 04/2020

Test Methods for Simulating the Solidification Process of Annular Gap Backfilling Materials

If a tunnel is driven by a TBM, the so-called annular gap remains between the ground and the tunnel lining, which must be filled during the tunnel drive. The essential process for the grouting...

more
Issue 04/2020 Darda GmbH

C20 Rock Splitter – a Safe, Low-Noise Alternative to Explosives and Hydraulic Breakers

Darda GmbH – a German subsidiary of Brokk AB, the world’s leading manufacturer of remote controlled demolition robots from Sweden – manufactures the C20 rock splitter, a carrier-operated attachment...

more

Ihre Suche nach "" :

5919 Treffer in "AT Minerals"

10785 Treffer in "Bundesbaublatt"

8021 Treffer in "Betonwerk + Fertigteil-Technik"

7305 Treffer in "bauhandwerk"

1198 Treffer in "Brandschutz"

1092 Treffer in "Computer Spezial"

4926 Treffer in "dach+holzbau"

17813 Treffer in "Deutsche BauZeitschrift"

6728 Treffer in "FACILITY MANAGEMENT"

12290 Treffer in "Kälte Klima Aktuell"

6269 Treffer in "metallbau"

1331 Treffer in "recovery"

12636 Treffer in "SHK Profi"

17184 Treffer in "tab - Das Fachmedium der TGA-Branche"

12290 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1944 Treffer in "tunnel"

5737 Treffer in "Zement Kalk Gips"

3532 Treffer in "Ziegelindustrie International"