Albaufstieg

Steinbühl Railway Tunnel: Safe with Shotcrete

Deutsche Bahn’s newly built route from Wendlingen to Ulm is a mecca for discerning tunnel builders. This is because half of the route passes through tunnels, which cut through a wide range of different rock strata.  A variety of construction methods are required: To create the first tunnel, the Steinbühl tunnel, the shotcrete construction method is used.

The 4.8 km long Steinbühl tunnel, together with the Boßler tunnel, will help trains with the difficult climb at Albaufstieg. It is entered at Hohenstadt, at an altitude of 746 metres, close to the A8 Autobahn. In eight years’ time, trains will...

Related articles:

Issue 01/2015 Germany

Steinbühl Tunnel: More than 50 % excavated

The 4847 m long Steinbühl Tunnel and the 8806 m long Boßler Tunnel, both with single-track bores, are part of the 14.5 km long Albaufstieg 2.2 planning approval section, which is an element of the...

more
Issue 04/2014 Germany

Albaufstieg: 5 km of Tunnel already driven

The Stuttgart 21 project plans the creation of two additional tracks on the Stuttgart-Ulm-Augsburg route for a top speed of 250 km/h. The altogether 60 km long new route between Wendlingen and Ulm...

more
Issue 06/2015

Steinbühl Tunnel: Karst and other special Features

1     Introduction The Albaufstieg, planning section 2.2, with a length of 15.77 km is the key part of the new line from Wendlingen to Ulm. The two bores of the Boßler Tunnel, each 8.8 km long,...

more
Issue 04/2015 Germany

Boßler Tunnel: 1000 m excavated, mechanized Drive scheduled to be extended

The DB Projekt Stuttgart-Ulm GmbH is forging ahead with the construction of the Boßler Tunnel as planned. It is the longest tunnel on the new Wendlingen-Ulm rail route with a length of 8806 m. The...

more
Issue 08/2013

Project Stuttgart–Ulm: The Albaufstieg Tunnels – Construction Methods and contractual Characteristics

The Albaufstieg The Albaufstieg links the slightly rising Albvorland area with the Alb high plateau. The entire “Alb­aufstieg” construction section by and large overcomes a height of 326 m in...

more