Guideline of the Austrian Society for Construction Technology (öbv), Vienna/A, December 2012, 99 pp., DIN A4 with 42 Ill. /Tab. and 50 sources, bound € 45.
www.bautechnik.pro
The “Inner-Shell...
At the end of 2010 the ÖBB recommissioned the 10 km long rail tunnel with 2 tracks after completing 8 evacuation and rescue ways leading to the parallel running Arlberg road tunnel The costs involved...
EPB shield S-574 for upgrading of the autostrada (motorway) route between Italy‘s cities of Bologna and Florence successfully passed its acceptance inspection by the Italian client at the Herrenknecht...
Progress requires mobility. And mobility requires infrastructures that function. It is hardly surprising that Europe is participating in the costs for upgrading the infrastructure and creating...
The new 2-track Eppstein rail tunnel was opened on April 2, 2013 after 2 years of construction. It replaces a 134 year old structure. For this purpose, services on the S-Bahn line 2 between Hofheim...
A 2-lane bi-directional tunnel is being built for the Roveredo Bypass – with shoulders at both sides and 2 lay-bys. It has up to 3,000 m overburden and runs north with 0.8 % gradient lying in an arc...
In the editorial to this issue, Dr. Leucker in his function as STUVA CEO put across its point-of-view: we need good transport networks and the STUVA advocates the promotion and sustenance of...
The STUVA and the magazine tunnel published by the Bauverlag will stage the 2nd German tunnel-Forum in autumn 2013.
This series of events will concentrate on light, colour and social safety and aims...
Initiator Prof. Dietmar Mähner was able to welcome almost 200 participants to the university centre for the 2nd Münster Tunnelling Colloquium staged by the Institute for Underground Construction, FH...
Dipl.-Ing. Wolfgang Feldwisch hands over the DB Netz AG’s Major Projects Division to Dipl.-Ing. Heinz Ehrbar
Dipl.-Ing. Wolfgang Feldwisch turned 65 in June 2013, which would enable him to enter a...