Stuttgart is the venue for this year’s STUVA Conference. Outside a circle of experts this event will pass practically unnoticed. Stuttgart and tunnelling are linked by the public at large with the...
Introduction
The Calarcá-Cajamarca Tunnel is part of the 503 km long Bogota-Buenaventura Corridor and is located in central Colombia, connecting the departments of Tolima and Quindio, across the...
The new Citybanan is a 6 km long, 2-track tunnel devised to relieve the S-Bahn transit system (more than 350 trains daily) in the centre of Stockholm and links Tomteboda on the northern fringe of the...
Fairs are numbered among the most important marketing instruments for companies. This applies especially to international front-runners such as the InnoTrans in Berlin. With over 2,500 exhibitors from...
Currently to develop the A1 motorway in Italy, the busy part-section between Bologna and Florence (90,000 vehicles/day) is being augmented by an alternative route – the 2,413 m long Sparvo Tunnel...
The Deutsche Bahn operates a 4-stage safety concept for all its tunnels embracing the measures prevention, incident reduction, self-rescue and third-party rescue. At present, the DB maintains 6...
The Albula Tunnel is located on the Chur-Thusis-St.Moritz/Chur-Thusis-Pontresina-Tirano route. Since 2008, it has been part of the UNESCO world heritage “Rhaetian Railway in the Albula/Bernina...
Fermacell Aestuver will present concepts for preventive fire protection in underground transportation facilities at the STUVA Expo from November 27 to 28 in Stuttgart (Hall 2, Stand A112). Aestuver...
Marti IAV Solbakk DA, part of Marti Group of Switzerland, chose Sandvik DTi jumbos for the excavation of Solbakktunnel, a part of the Ryfast Project in Norway. With its length of 14.3 kilometers, the...
Almost 30,000 vehicles pass through the 6.7 km long Pfänder Tunnel each day, making it one of the busiest tunnels in Austria. Extensive redevelopment measures were undertaken during the course of the...