Executing a tunnel drive beneath an existing railway line allows the tracks very little room for settling. The excavation must be devised in keeping with these marginal conditions. Furthermore, continuous checking of the track settlement must be assured for control purposes. By installing a corresponding monitoring system, it is possible for the driving operations to be monitored permanently by all those involved and adapted to the given situation.
more