Search

Your search for "" found 1944 Hits

Issue 05/2021

Fogtec is a worldwide leading manufacturer for water mist systems for tunnels. Various high-profile tunnels worldwide are protected with Fogtec’s full scale tested solutions. The scope of supply...

more
Issue 05/2021

Issue 05/2021

A.S.T. Bochum GmbH

Partner to the construction industry: Tunnelling, microtunnelling, special civil engineering, freezing engineering and other...Industry supplier: Machine technology, agricultural engineering,...

more
Issue 05/2021

Issue 05/2021

ITC SA

We are located in the heart of the Swiss alps in Martigny and are a tunnelling equipment designer and supplier. Our application areas are road, highway, railway and subway tunnels as well as tunnels...

more
Issue 05/2021

H+E, based in Bochum, has made a name for itself with over 20 years of experience in the field of conveyor technology and offers tailor-made solutions for a functioning backup in the tunnelling...

more
Issue 05/2021

KHK – Cromm & Seiter GmbH has been an efficient partner for industry, construction, municipalities and energy supply in the civil engineering sector for 30 years. The portfolio includes, among other...

more
Issue 05/2021 tunnel Series: Interaction Modeling in Mechanized Tunneling, Part 5

Advanced Exploration Concepts in Tunnelling

This article presents a three-staged exploration algorithm for mechanized tunnelling, which combines two different techniques. Firstly, a supervised machine learning methodology utilizes common...

more
Issue 05/2021

Lötschberg Base Tunnel, Second Tube: Automated Cost Optimization of the Inner Lining

To realize the integrated synchronized timetables in long-distance traffic and to increase the capacity in freight traffic between Brig and Bern, the two-lane extension of the Lötschberg Base Tunnel (LBT) is necessary. This demands the installation of an inner lining over 14 km in the second LBT tube. Considering the excavation profile available, a skillful choice in the sequence of formwork carriage geometries (FCGs) can lead to optimization of the concrete volume to be installed, the feasibility of the build and the construction sequences. In the sense of a “proof of concept”, mathematical optimization algorithms are used to find a cost-optimal sequence of FCGs for a defined tunnel section. The article in tunnel 5/2021 describes the chosen approach and the results of the cost optimization.

more
Issue 05/2021 Mexico

Rectangular Rock Mining Machine for Flat Invert

Robbins’ latest innovation is making good headway on a non-circular tunnel excavation in hard rock. The rectangular TBM, known as the MDM5000 (standing for Mine Development Machine with dimensions of...

more

Ihre Suche nach "" :

5919 Treffer in "AT Minerals"

10785 Treffer in "Bundesbaublatt"

8021 Treffer in "Betonwerk + Fertigteil-Technik"

7305 Treffer in "bauhandwerk"

1215 Treffer in "Brandschutz"

1092 Treffer in "Computer Spezial"

4926 Treffer in "dach+holzbau"

17812 Treffer in "Deutsche BauZeitschrift"

6728 Treffer in "FACILITY MANAGEMENT"

12288 Treffer in "Kälte Klima Aktuell"

6269 Treffer in "metallbau"

1331 Treffer in "recovery"

12641 Treffer in "SHK Profi"

17183 Treffer in "tab - Das Fachmedium der TGA-Branche"

12286 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1944 Treffer in "tunnel"

5737 Treffer in "Zement Kalk Gips"

3532 Treffer in "Ziegelindustrie International"