Search

Your search for "" found 1944 Hits

Issue 03/2010 Switzerland

Gotthard Road Tunnel to be redeveloped

The 17 km long Gotthard Road Tunnel possesses a 2-lane bore operating bidirectionally with a parallel negotiable evacuation tunnel. It was opened in 1980. During the next few years the surfacing and...

more
Issue 03/2010 Switzerland

Intermediate Financing for the Zurich DML

The Zurich cross-city link (DML) embraces the new Zurich-Alstetten – Hauptbahn-hof – Zurich-Oerlikon railway route, the 4-track underground through station Löwenstraße as well as the extension...

more
Issue 03/2010 Austria

New Semmering Base Tunnel: Exploratory Phase concluded

The roughly 27 km long new Semmering Base Tunnel (nSBT) on the selected Pfaffensattel alignment consists of 2 single-track tunnel bores, which are connected with one another via cross-passages every...

more
Issue 03/2010 Austria

Breakthrough at Pfänder Tunnel

A second bore for the 6.6 km long Pfänder Tunnel was driven with a tunnelling machine (S-494, Herrenknecht AG) with 11.85 m cutterhead diameter. The support was provided with 25 cm thick and 2 m...

more
Issue 03/2010

Austria Lower Inn Valley Railway: Route selected between Kundl and Kufstein

The first upgraded section of the new Lower Inn Valley Railway between Kundl and Baumkirchen will start operating in 2012. From then on goods trains will mainly travel underground, something which...

more
Issue 03/2010 Argentine/Chile

Railway Tunnel to be built through the Andes

Argentine and Chile have decided to build a railway tunnel through the Andes, which will directly link the Mendoza region in the mid-west of the Argentine with both states. An appropriate treaty was...

more
Issue 03/2010 Germany

The Hirschhagen Tunnel approved

The plan approval decision for the construction section from Helsa-East to Hessisch Lichtenau-West of the A44 motorway also marks work starting on the 4.1 km long Hirschhagen Tunnel, the longest on...

more
Issue 03/2010

ÖVBB „Shotcrete" Guideline

Published by: Österreichische Vereinigung für Beton und Bautechnik (ÖVBB) 12/2009: 93 pp. A4 with 32 Ills./Tables and 16 Sources. 45 euros. ÖVBB, A-1040 Vienna, Karlsgasse 5.Fax 0043.1.504.9599.The...

more
Issue 03/2010 New Products

Cable Protection Pipes as ready-made empty Duct Pack

Untertiteltext Englisch

Together with the Heibel GmbH trade agency the JV Katzenbergtunnel developed a novel system for laying cable protection pipes as ready-made parts in “pack form”. This saves time and space, the...

more
Issue 03/2010 Schuman-Josaphat Rail Link

Schuman-Josaphat Rail Link in Brussels/B

The tunnel under construction is part of the extended Schuman-Josaphat S-Bahn network around Brussels/B. This network is intended to improve the train frequencies and speeds on the rail lines up to 30...

more

Ihre Suche nach "" :

5919 Treffer in "AT Minerals"

10785 Treffer in "Bundesbaublatt"

8021 Treffer in "Betonwerk + Fertigteil-Technik"

7305 Treffer in "bauhandwerk"

1215 Treffer in "Brandschutz"

1092 Treffer in "Computer Spezial"

4926 Treffer in "dach+holzbau"

17812 Treffer in "Deutsche BauZeitschrift"

6728 Treffer in "FACILITY MANAGEMENT"

12288 Treffer in "Kälte Klima Aktuell"

6269 Treffer in "metallbau"

1331 Treffer in "recovery"

12641 Treffer in "SHK Profi"

17183 Treffer in "tab - Das Fachmedium der TGA-Branche"

12286 Treffer in "Tiefbau Hochbau Ingenieurbau Straßenbau"

1944 Treffer in "tunnel"

5737 Treffer in "Zement Kalk Gips"

3532 Treffer in "Ziegelindustrie International"