With the final breakthrough in the western bore the two 57 km long main bores of the Gotthard Base Tunnel have been completely excavated. On Wednesday...
Fire is a physical and dynamic phenomenon! Fire-protection concepts should consequently be oriented to physics under dynamic boundary conditions. The...
As a result of the ever-greater spread in fields of application for TBM drives in tunnelling, the process technology of the driving methods must also...
Since end of 2008 the biggest infrastructure project in Belgium is under construction as a Public Private Partnership project in the Antwerp sea port...