Safety Concepts for Shield Driving in Berlin/D

A 3.4 km long mainline tunnel for the 4-track north-south link for long-distance and regional services was built as the core of Berlin’s central area (ZBB). The following report examines the various safety concepts for shield driving in Berlin.

Traffic Concept
 A 3.4  km long mainline tunnel for the 4-track north-south link for long-distance and regional services was built as the core of Berlin’s central area (ZBB) (Fig. 1). Its manner of construction was determined by local conditions and the soil and groundwater conditions: cut-and-cover with excavation pits with underwater concrete base, shield drives with monocoque segmental lining and application of the caisson method so that the groundwater was affected as little as possible.
Tunnelling by mining means using shield driving with fluid-supported face represents the most...

Related articles:

Issue 08/2009 TBM Technology

Engineering Innovations for Mix-Shield and EPB Technology for two major Projects in Scandinavia

Two trends have become discernible in the development of mechanised tunnel driving technology in recent years: firstly demands on the engineering technology have risen significantly. Secondly ever...

more
Issue 05/2019

Classifying the Subsoil into Homogeneous Areas for Drives Using Shield Machines

1 Introduction Until German standard DIN 18312 for underground work and in turn also work involving shield machines was updated in 2015, the ground penetrated was classified for constructional...

more
Issue 02/2013

Mechanised Tunnel Drives with optimised Support Pressure Control

Introduction The technical and economic possibilities for the application of mechanised drives for all possible diameters are constantly growing. Tunnelling measures are consequently being more...

more
Issue 04/2012

Kaiser Wilhelm Tunnel: Undertunnelling Uptown Cochem in EPB Mode

1 Stage reached in accomplishing the Kaiser Wilhelm Tunnel The 2-track Kaiser Wilhelm Tunnel, which opened back in 1879, is located on the Coblenz-Perl Moselle rail route between Ediger-Eller and...

more
Issue 06/2010 4th BASF TBM Conference in London/GB – Laboratory Tests with conditioned Soils for EPB Tunnelling

Laboratory Tests with various conditioned Soils for Tunnelling with Earth Pressure Balance Shield Machines

The main application area for earth pressure balance (EPB) shield machines is soil with at least 30 % of fines. Especially in coarse-grained material and in connection with ground-water pressure, the...

more