Influence of Clogging on the Muck Transport in Shield Machines

Shield drives in fine-grained clayey soil are frequently affected by clogging. Walls of clogged material represent a special form of this particular obstacle. Such walls can attain a high degree of strength and develop directly in the TBM’s material flow. The fact that these walls of clogged material exacerbate or even interrupt the direct path of the excavated material from the rear side of the cutting wheel to the follow-up conveying system makes driving especially difficult (Fig. 1).

Conveyance of the excavated material from the cutting wheel towards the rear must therefore be carried out by a circuitous route with the material first being lifted by the cutting wheel and then transferred upwards. From there it moves backwards in the excavation chamber over the top of the walls of clogged material towards the suction inlet or in the case of the open mode EPB shield, towards the screw opening.

Such phenomena have been observed both in the case of unsupported open-mode EPB drives as well as in fluid-supported slurry shields, where the excavated material has to be transferred...

Related articles:

Issue 02/2009 Mechanised Driving

Mechanised Driving in Subsoil prone to Clogging, Part 2

Selecting the Driving Technology Optimal harmony between the subsoil and the process technology is essential for a successful excavation. In this connection the driving technology must adapt to the...

more
Issue 01/2009 Mechanised Driving

Mechanised Driving in Subsoil prone to Clogging, Part 1

Subsoil prone to Clogging, Part 1

Optimal harmonisation between the subsoil and the process technology is of decisive importance in tunnelling. The more frequently changing subsoil conditions can occur, the less their extent can be...

more
Issue 01/2009 Germany

Finne Tunnel: Driving Operations running smoothly

Driving Operations at Finne Tunnel

The tunnel consists of 2 parallel tubes with an external diameter of roughly 11??m, a 45??cm thick segmental lining and connecting passages set every 500??m between the tubes. This results in 13...

more
Issue 06/2011

Mechanical and process-technical Characterisation of the Rock influenced by interactive Behaviour of Machine – Ground

1 Introduction In the case of TBM drives the excavated material is subject to numerous processes of change while being extracted by the cutting wheel right up to being discharged at the portal, which...

more
Issue 03/2021 tunnel Series: Interaction Modeling in Mechanized Tunnelling, Part 3

Face Support Pressure, Soil Conditioning and Material Transport in Hydro and EBP Shields

1 Soil Conditioning in Tunnelling with EPB Shields The evaluation of the support medium inside the excavation chamber during advance with an EPB-shield in closed mode is only indirectly possible by...

more