Tunnel Drainage

Guideline

Issued by: Österreicherische Vereinigung für Beton und Bautechnik (ÖVBB)

4/2010: 99 pp. A4 with 108 Ills./Tables and 180 Sources. ÖVBB, A-1044 Vienna, Karlsgasse 5, Fax: 0043.1.504.9599. € 45. http://www.concrete.austria.com

Generally speaking any subsequent seeping water must be collected by a primary or secondary drainage system in tunnels not designed to confine pressurised water and transferred to the receiving water. Damage resulting from closed drainage lines and any resultant damming up of water or leakages leads to complicated maintenance work, costly redevelopment measures and...

Related articles:

Issue 03/2010

ÖVBB „Shotcrete" Guideline

Published by: Österreichische Vereinigung für Beton und Bautechnik (ÖVBB) 12/2009: 93 pp. A4 with 32 Ills./Tables and 16 Sources. 45 euros. ÖVBB, A-1040 Vienna, Karlsgasse 5. Fax...

more
Issue 03/2010

ÖVBB "Shotcrete" Guideline

Published by: Österreichische Vereinigung für Beton und Bautechnik (ÖVBB) 12/2009: 93 pp. A4 with 32 Ills./Tables and 16 Sources. 45 euros. ÖVBB, A-1040 Vienna, Karlsgasse 5. Fax...

more
Issue 07/2012 Code of Practice on Sintering Potential

Establishing reduced Sintering Potential for Tunnel Drainage

In the case of tunnels produced by mining means liquids from the carriageway are usually removed separated from accompanying underground water. Sintering of the secondary drainage system for transport...

more
Issue 06/2013 Book Review

Austrian Guideline on Inner-Shell Concrete

Guideline of the Austrian ­Society for Construction Technology (öbv), Vienna/A, December 2012, 99 pp., DIN A4 with 42 Ill. /Tab. and 50 sources, bound € 45. www.bautechnik.pro The “Inner-Shell...

more
Issue 08/2008 Conferences

Drainage Systems in Tunnelling

The group for geotechnics at Graz Technical University (Institute for Applied Geo-Sciences) together with the ETH Zurich (Institute for Construction Planning and Construction Operation), the...

more