bauma Pre-Report

bauma 2010 in Munich again booked out

The bauma from April 19 to 25, 2010, International Trade Fair for Construction Machinery, Building Material Machines, Mining Machines, Construction Vehicles and Construction Equipment will again be booked out in 2010 in spite of additional space: altogether it embraces around 550,000 m² so that it will also be in a position to offer an extensive programme to the interested international tunneller.

More Space for Formwork and Scaffolding as well as Construction Equipment and Tools

Thanks to temporary halls the Messe München is able to provide additional exhibition space for those displaying...

Related articles:

Issue 05/2022 Peri

Flexible Solutions for Tunnel Construction

Formwork and Scaffolding Manufacturer Shows Its Expertise at Bauma Safety and efficiency on the construction site also increase the profitability of a tunnel construction project. That is why Peri...

more
Issue 04/2009 Formwork Technolgy

Formwork Technology for Airport Link Tunnel in Brisbane/AUS

At the end of March 2009, Swiss company Ceresola TLS AG was awarded contract for the provision of formwork technology for the construction of the Airport Link Tunnel in Brisbane/AUS. The Airport Link...

more
Issue 04/2013 Further Development

Increased Economy of Tunnel Formwork Carriage

Peri GmbH presented new system components and manifold further developments for formwork and scaffolding technique at the 2103 bauma. The tunnel formwork carriage on display were also distinguished by...

more
Issue 01/2023 Formwork Technology

Fully Hydraulic Crawler Driven Formwork Carriage for Varying Tunnel Cross-Sections

Since May 2020, tunnel construction work has been underway to the north and south of the Danube for the future accesses and exits of the suspension bridge. Five different tunnel cross-sections, the...

more
Issue 08/2013 Germany

Hahnenkamp Tunnel: Tunnel Outer Walls and Trough Walls largely concreted without Anchors given constricted Space Conditions and high Groundwater

A roughly 11.5 km long, 4-lane route runs to close the gap between the A?2 and A?30 motorways – approx. 2 km as federal highway 61 and 9.5 km as the A?30 motorway and serves to relieve the centre of...

more