Content

Nachrichten | News

Projektbericht | Project Report

Kerenzerberg Road Tunnel Safety Gallery

The 5.7 km long Kerenzerberg Road Tunnel on the A3 national road is undergoing a safety upgrade and maintenance 35 years after it was opened. A key element of this maintenance is the new construction of a parallel safety gallery. The standard cross section of the safety gallery is characterised by combined usage as a service tunnel with an escape tunnel as well as an exhaust duct.

more

Baumaschinen | Construction Machinery

Schalungstechnik | Formwork Technology

Peri

Flexible Solutions for Tunnel Construction

Peri’s Bauma exhibition hall on the open-air site North (stand FN 719) in Munich will be themed “Shaping the future” from 24 to 30 October 2022, with exhibits, live demonstrations, individual...

more

Forschung & Entwicklung | Research & Development

Technische Ausstattung | Technical Equipment

Adaptation Lighting for Road Tunnels

When it comes to traffic safety in a tunnel, optimal lighting makes a big difference. To enable the human eye to adapt to the vastly different lighting conditions outside and inside, it’s essential...

more

Logistik | Logistics

STUVA-Nachrichten | STUVA News

Conference Report

7th Munich Tunnelling Symposium

There was a sense of relief written all over the organisers‘ faces when, after a delay of more than two years, the 7th Munich Tunnelling Symposium was finally able to open its doors at the University...

more