Flir

Thermal Fire Detection System in the Krohnstiegtunnel

The 419 m long Krohnstiegtunnel is a road tunnel running under the runway of the Hamburg Airport. It offers passage for vehicles, pedestrians, and cyclists. Since the tunnel was equipped with advanced automatic incident detection and fire detection technology from Flir in 2016, tunnel operators can monitor the safety inside the Krohnstiegtunnel 24/7, using real-time thermal video from Flir ITS-Series AID cameras installed along the entire length of the tunnel. The new detection system proved its worth shortly after installation began.

In November 2016 it identified a burning vehicle inside the...

Related articles:

Issue 06/2014 Monitoring Traffic

Detecting potential Fire Sources at the Karawanken Tunnel

The Swiss specialists for optical traffic data collation Sick System Engineering AG have developed a detection system for preventing tunnel fires. The thermal portal system enables potentially...

more
Issue 03/2011

Video-based smoke and flame detection for tunnels

Protective Objectives and Fire-Scenarios Fire-safety in tunnels has always posed special challenges to planners and tunnel operators. Depending on the length of the tunnel section, it is, as in so...

more
Issue 07/2010 Fire Protection

Fire-safety in the Channel Tunnel

At around 50 km, the Channel Tunnel between Co-quelles, in France, and Folke-stone, England, is currently the world‘s longest rail tunnel. It is used by Eurostar trains on their route from London to...

more
Issue 02/2015 France

152 Cameras are monitoring Traffic in the Prado Tunnels of Marseille

The 2.5 km long Prado Carénage Tunnel allows traffic to quickly cross the city of Marseille without leaving the motorway. The Tunnel Prado Carénage connects the Southern districts of Marseille and...

more
Issue 02/2018 Germany

Katzenbergtunnel on the Autobahn A3: Fire Protection in the North Tunnel with 25 Axial Fans

The 570 m long Katzenberg Tunnel on the German Autobahn A3 near Würzburg is currently under construction by cut-and-cover with a total investment volume of about 44 million euros. The first...

more