Online Supervision of mechanised Tunnelling

In mechanised tunnelling, the sensor system on the tunnel boring machine (TBM) and its control system (navigation) as well as surveying and precast segment production all record a great amount of varied data. The analysis, visualisation and monitoring of this data
represents an important instrument for efficient control of mechanised tunnelling.

The present article describes an online monitoring platform for the integrated recording and processing of the data recorded as a tunnel advances. The emphasis of the platform is the construction element-related and georeferenced recording of the data, and the processing and provision of the great quantities of data, which is recorded in particular by the sensors on the TBM and generated in the course of surveying. The real-time recording of this TBM process data enables a comprehensive reproduction of the entire tunnelling works with various analysis functions, including flexible averaging,...

Related articles:

Issue 07/2015

The Boßler Tunnel – the longest Tunnel on the new Line Wendlingen–Ulm

Overview of the overall Project The Stuttgart–Ulm rail project is divided into the project sections Stuttgart–Wendlingen (Stuttgart 21) and the new line Wendlingen–Ulm. The project section...

more
Issue 08/2010 Switzerland

Gotthard Base Tunnel: High-accuracy at final breakthrough

The tunnel-boring machine, affectionately dubbed „Sissi“, in honour of the 19th century Austrian empress, by the international team of tunnellers engaged on the project, completed the final...

more
Issue 02/2014 Monitoring

Data management and risk analysis for tunnelling projects

The execution of underground works requires an assessment of all risks during the planning phase and its comprehensive control during construction to establish acceptable levels of security. This is...

more
Issue 02/2023 Austria/Italy

Brenner Base Tunnel: TBM Virginia Has Reached the Brenner

After 4 years, the first tunnel boring machine (TBM) of a main tunnel in the Brenner Base Tunnel successfully completed driving on 30 March 2023. TBM Virginia covered around 14 km on its journey,...

more
Issue 07/2011 Second revised edition

Mechanised Tunnelling with Shield Driving

Prof. Bernhard Maidl, Dr.-Ing. E.h. Martin Herrenknecht, Dr.-Ing. Ulrich Maidl, Dr.-Ing. Gerhard Wehrmeyer, 2nd completely revised and amended edition. ISBN 978-3-433-02948-0. 2011, 512 pp. with 468...

more