Design, Construction and BIM Application at the Albvorland Tunnel

The present article offers interesting insights into the tunnel structures in the Alb foreland (Albvorland Tunnel, Kleine Wendlinger Kurve, goods train link) and the fundamental application of BIM (Building Information Modeling) method for the implementation of the complex tunnel project.

1 Introduction

The Albvorland project section has a total length of about 14.9 km. This section of the new Wendlingen–Ulm highspeed railway comprises the planning approval sections 2.1 a/b and 2.1 c (Fig. 1). One of the most prominent structures in this section is the Albvorland Tunnel, which runs from west to east with a total distance of about 8.2 km.

After crossing the River Neckar and the Neckartalbahn railway line, the single-track Wendlinger Kurve branches off to the south (Fig. 2) and connects the new line with the existing line 4600 (Neckartalbahn) in the direction of Tübingen. This...

Related articles:

Issue 05/2018

BIM Application Cases at the Albvorland Tunnel

1 Introduction No other client in Germany is investing so much in infrastructure projects and operating them like German Railways (DB). They also have a policy of keeping up with internationally...

more
Issue 06/2019 Germany | Deutschland

Albvorland Tunnel: Breakthrough in Southern Tube

Implenia has been commissioned by Deutsche Bahn to build the 8-km Albvorland Tunnel, a key section of the new railway line between Stuttgart and Ulm. The breakthrough of October 29 in the southern...

more
Issue 01/2020

BIM Applications in Design and Construction of the Soft Ground Section at the Bözberg Tunnel

The Project The 4-m corridor of the SBB will enable all goods containers with a corner height of up to 4 m and a width of up to 2.6 m to be transported along the Gotthard axis from 2020. The new...

more
InnoTrans 2016

STUVA Tunnel Forums: BIM in Tunnelling; Safety & Security in underground Train Stations

The 11th InnoTrans wound up after four action-crammed days on September 23 with its best ever result. New records were recorded for exhibitor and trade visitor participation. Some 145 000 trade...

more
Issue 07/2016 InnoTrans 2016

STUVA Tunnel Forums: BIM in Tunnelling; Safety & Security in underground Train Stations

The 11th InnoTrans wound up after four action-crammed days on September 23 with its best ever result. New records were recorded for exhibitor and trade visitor participation. Some 145 000 trade...

more