Germany

Breakthrough in Filder Tunnel

The 9.5 km long Filder Tunnel connects Stuttgart Central Station, lying in a valley basin, with the Filder plateau located some 155 m higher. The four sections of its two tunnel tubes are being driven one after the other by means of a Multi-Mode tunnel boring machine (TBM) with 10.82 m shield diameter – the lower portion of the tunnel over roughly 3.6 km and the upper one over a length of approx. 4 km. The TBM is not applied in the 1162 m long geological transition zone (roughly in the middle of the tunnel) consisting of unleached gypsum keuper.

On July 4, 2017, the TBM reached the geological transition zone in the upper portion of the west tube, thus successfully completing its second shield passage. In order to accomplish its third passage, the TBM moves through the transition zone tackled by conventional means and is turned round underground in the cavern foreseen for this purpose in front of Stuttgart Central Station prior to embarking on the final section of the Filder Tunnel as from autumn 2017.

G. B.

x

Related articles:

Issue 06/2014 Germany

Stuttgart 21: Construction of the Filder Tunnel has commenced

In July a new phase has begun in the construction of Stuttgart‘s underground railway station as political and business representatives celebrated commencement of construction of the Filder Tunnel....

more
Issue 05/2018

Filder Tunnel and Tunnels to Ober- and Untertürkheim

1 Project The roughly 9.5 km long Filder Tunnel is the longest tunnel of the Stuttgart–Ulm project. Running from the Central Station, the tunnel with an average gradient of 16 ‰ overcomes a...

more
Issue 06/2016 Germany

One Third of the Tunnels of Stuttgart 21 driven

The DB Projekt Stuttgart–Ulm GmbH passed the 20 km mark for tunnelling on the Stuttgart 21 project at the end of September 2016, meaning that more than a third of the tunnels for the reorganisation...

more
Issue 08/2015 Germany

TBM in the Filder Tunnel has completed the first Shield Drive

The tunnel boring machine (TBM) driving the Filder Tunnel as part of the Stuttgart 21 infrastructure project has completed its first drive in the middle of November 2015. The Filder Tunnel (PfA 1.2)...

more
Issue 01/2019 Germany ¤ Deutschland

Filder Tunnel: Unusual TBM Turning Manoeuvre

Video clip of the 180 ° turn (with German commentary)

Client DB Projekt Stuttgart–Ulm GmbH is continuing the construction of the Filder Tunnel as part of the Stuttgart 21 project. With the installation of the first segment rings, tunnelling and thus the...

more