Tunnelling in Germany: Statistics 2009/2010, Analysis and Outlook

For more than 30 years, the STUVA has compiled statistics on tunnelling activities in Germany in keeping with a corresponding proposal put forward by the International Tunnelling and Underground Space Association [1].

1 Statistics on Tunnels under Construction 2009/2010

As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2009/2010. The outcome is compiled in tabular form for the month of December 2009 and subsequently assessed. The table follows up its predecessors published for the years 1978 [2] to 2009 [3]. Only tunnels and drain/sewer structures which possess an accessible (walk-in) excavated crosssection, i.e. a clear minimum diameter of 1,000 mm or, including the pipe wall, a minimum cross-section of roughly 1 m2, are listed. On the...

Article as PDF

Related articles:

Issue 08/2011

Tunnelling in Germany: Statistics 2010/2011, Analysis and Outlook

1 Statistics on Tunnels under Construction 2010/2011 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2010/2011. The outcome...

more
Issue 08/2009 Germany

Tunnelling in Germany: Statistics 2008/2009, Analysis and Outlook

1 Statistics on Tunnels under Construction 2008/2009 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn-of-the-year 2008/2009. The outcome is...

more
Issue 08/2012

Tunnelling in Germany: Statistics (2011/2012), Analysis and Outlook

1 Statistics on Tunnels under Construction 2011/2012 As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2011/2012. The outcome...

more
Issue 06/2022

Tunnelling in Germany: Statistics (2021/2022); Analysis and Outlook

1 Tunnels Under Construction As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2021/22. The outcome is compiled in tabular...

more
Issue 01/2024

Tunnelling in Germany: Statistics (2022/2023), Analysis and Outlook

1 Tunnels Under Construction As in previous years, the STUVA also undertook a survey of current tunnelling projects in Germany at the turn of the year 2022/23. The outcome is compiled in tabular form...

more