x

Related articles:

Issue 05/2021 TPH Bausysteme

Rammed Spile Pre-Support in the Vötting Tunnel

The main challenge in the construction of the 705 m long Vötting Tunnel: The conventionally driven section had to be excavated under a built-up area with an overburden of in part only 8 m. The...

more
Issue 02/2021 Germany/Australia

MBCC Group to Acquire TPH Bausysteme and Bluey Technologies

MBCC Group, one of the leading suppliers of construction chemicals and solutions worldwide, and TPH Bausysteme GmbH signed a purchase agreement for the acquisition of TPH by MBCC Group in March 2021....

more
Germany/Australia

MBCC Group to Acquire TPH Bausysteme and Bluey Technologies

TPH Is Specialized in Injection and Sealing Sytems for Tunnelling TPH is a Germany-based global supplier of products and systems for injection technology, joint sealing and bonding, concrete...

more
Issue 02/2019 TPH Bausysteme/Germany

First Crack Filler with DIBt Certificate

The German DIBt (technical institute serving the construction sector) has awarded TPH’s Rubbertite acrylate gel its certificate for complying with stability requirements on structural facilities in...

more
Issue 04/2016

Sylvenstein Reservoir: Waterproofing of the Seepage Water Tunnel

As the oldest reservoir in Bavaria, and the most important for flood protection, the Sylvenstein Reservoir (Fig. 1) has been fulfilling its purpose for more than half a century and has demonstrated...

more