Research Project AVANT

Adaptive Planning of Grouting Measures in Tunnelling Using Artificial Intelligence

In the course of tunnel drives, pre-support measures can be necessary to waterproof or consolidate the surrounding ground. Since such measures can sometimes drastically slow the advance rate, their efficient planning is of great significance. One frequently undertaken measure is grouting, which can be carried out flexibly with relatively simple machinery. Alongside this flexibility, continuous adaptation of the parameters as the work proceeds must also be possible. This may mean regular adaptation – both of drilling patterns and depths as well as grouting parameters, grout materials or stop criteria.

Real-Time Use of Drilling and Grouting Data for the Construction Process

Digital data logging systems have become increasingly prevalent in drilling and grouting technology. These have only been used until now for documentation in connection with quality management. In the course of the AVANT project, the intention is to make use of this data in order to be able to implement tunnel drives and the associated grouting work still more efficiently and thus more economically. The cantral idea is to immediately process drilling and grouting data underground and use it as the tunnel proceeds instead of just using the data for documentation purposes. This entails connecting the individual steps to create a dynamic real-time process. Artificial Intelligence methods are to be used on several levels:

Geological models created automatically based on drilling data to characterise the rock mass regarding the practicality of grouting

Grouting models, which for example can be derived from typical pressure-quantity parameters for the assessment of grouting success

 

The possibilities of this form of data exploitation using Artificial Intelligence are currently being investigated in the research project AVANT. Altogether five companies and research institutes from Germany and Austria are involved:

STUVA e. V., Cologne

eguana GmbH, Vienna

geoteam Ingenieurgesellschaft GmbH, Dortmund

Montanuniversität Leoben

Züblin Spezialtiefbau Ges.m.b.H., Vienna

 

The project is being financially supported from 2020 to 2022 by the German Federal Ministry for Economic Affairs and Energy (BMWi) and on the Austrian side by the Austrian Research Promotion Agency (FFG).

x

Related articles:

Issue 05/2020 Research Project AVANT

Adaptive Planning of Grouting Measures in Tunnelling Using Artificial Intelligence

In the course of tunnel drives, pre-support measures can be necessary to waterproof or consolidate the surrounding ground. Since such measures can sometimes drastically slow the advance rate, their...

more
Issue 05/2019

Red Line Tel Aviv: Planning and Constructing the TBM Tunnels of the Eastern Section (Part 2)

6 Annular Gap Grout A cement-based mortar was used for grouting the annular gap for tunnelling the eastern section of the Tel Aviv Red Line [2]. The mixes applied are presented in Table 1. The grout...

more
Issue 05/2009 Construction Equipment

Mixing and Grouting Systems for the Weinberg Tunnel in Zurich/CH

Mixing and grouting systems made by Häny are being used to construct the new Alstetten – Zurich Main Station - Oerlikon cross-city underground link in Switzerland. In contract section 3 (Weinberg...

more
Issue 03/2020

Küssnacht Southern Bypass – Support Measures for a Shallow Soft Ground Tunnel Under a Built-Up Area

1 Introduction The first section of the southern bypass around the historic village centre of Küssnacht am Rigi in the Canton Schwyz is to be completed by September 2020. The objective is to relieve...

more
Issue 03/2019

Tunnel Inspection with Artificial Intelligence

1 Introduction Every year 4700 km of new tunnels are built, resulting in an annual growth value of 7 %. Accordingly, the total amount of tunnels that must be inspected will increase in the future....

more