Job offers - Technical engineers with focus areas in Slurry TBM & Hard rock TBM (Gripper, Telescope TBM)

22.05.2015
Erkelenz, Germany

CREG TBM Germany GmbH

Technical engineers with focus areas in Slurry TBM & Hard rock TBM (Gripper, Telescope TBM) 

more information (Download PDF)

-------------------------------------------------------------------------------------

22.05.2015
Erkelenz, Germany

CREG TBM Germany GmbH

TBM Sales Manager for the Regions of Europe, North, Central and South America

more information (Download PDF)

-------------------------------------------------------------------------------------

x

Related articles:

Issue 06/2015 Lebanon

CREG signed two Gripper TBMs to Beirut Water Supply Tunnel Project

On July 17, 2015, the Italian construction contractor CMC and TBM manufacturer CREG signed a procurement contract of supplying two Gripper TBMs with a diameter of 3.5 m each for the LB-Greater Beirut...

more
Issue 06/2016 Lebanon

Great Beirut Water Supply Project: First of Two Hard Rock Tunnel Boring Machines in Operation

A number of years ago the Great Beirut Water Supply project (GBWSP) was established to improve the drinking water provision of the greater Beirut area and strengthen the weakly structured southern...

more
Issue 06/2020

Hiroshima Heavyweight: Slurry Tunneling in Japan’s Hard Rock

Project Background Japan’s Hiroshima Expressway Line 5 is designed to improve access between Hiroshima Station and the national Sanyo Expressway via Hiroshima Expressway Line 1. Specifically, the new...

more
Issue 02/2019 China/Germany/France

Strategic Partnership between CREG & Metalliance

In February 2019 the China Railway Engineering Equipment Group (CREG) and French multi-service vehicle (MSV) manufacturer Metalliance have announced a strategic partnership comprising a cooperation in...

more